Company engineering qualification
We have an engineering team of more than 10 people; each engineer has no less than 3 years of PSA engineering experience; and holds professional certifications (such as welding qualifications, Atlas Copco certified engineer, etc.).
Customized engineering solutions
Provide personalized solutions based on customer site, gas requirements, purity requirements (e.g. 99.9% to 99.999%)
Get a free installation plan
Standardize the installation process
-
Preliminary investigation
site measurement, air source analysis, environmental assessment. -
Scheme design
layout, safety risk warning. -
Device installation
Install pipes and cables. -
Debugging test
equipment inspection, pressure and air tightness test, index debugging and confirmation. -
Customer training
operation specification explanation, daily maintenance demonstration. -
Acceptance and delivery
Sign the acceptance report.
Installation technical details
-
Noise reduction design
Shock absorption treatment of equipment foundation. -
Energy saving optimization
Pressure equalization regulation, pressure start and stop. -
Security redundancy
Warning sign, fire extinguisher, emergency shutdown interlock. Pressure protection device.
Security commitment
All tanks meet the GB/T 150-2011 pressure vessel standard.
Typical engineering case

Aquaculture
Aquaculture (with 90% oxygen purity and significant economic growth).

Storage Control
Storage Control (nitrogen purity of 90%, significant economic growth)
Engineering data
Accumulated Installation Volume (\"10,000+ systems\")
Average Installation Cycle (\"7-day completion of turnkey projects\")
-
10000+Cumulative installed capacity
-
7+Average installation period
Quick response commitment
Expedited Service
7-Day Completion of System Installation, Commissioning, and Acceptance
Global Service Network
Distributors/Collaborative Installation Teams
After-sales Protection
-
Free warranty period
Core components (adsorption tower, valve group) 1 year warranty. -
Long term tracking service
Online quarterly return inspection.